Stryker Brigade – Huntingdon

Responsibilities

  • Survey
  • Site Planning, Design, and Layout - Accommodating design and detail revisions
  • Accommodating DGS Plan Revisions, Procedures, and Review Process
  • Accommodating Design Details for Security, Anti-Terrorist/Force Protection Measures
  • Obtaining Municipal Approvals
  • Utility Coordination
  • Construction Drawings
  • Construction Inspection

Owner

PA Army National Guard / PA Department of General Services / Department of Military and Veterans Affairs

Project Details

This project included construction of new Readiness Center/Armory on 12 acres of Department of Military and Veteran’s Affairs (DMVA) land.

Phase 1 included a schematic design/engineering.  Phase 2 – site design and construction documents – was awarded to Keller Engineers as part of a Design-Build Contract.

The Design-Build contract included design that evolved as construction documents were being finished through negotiations with the DMVA and negotiations with adjacent property owner to obtain easements for connection to sanitary sewer and potable water supply.

Photos

Keller Engineers has been the partnering Engineer firm for Bedford Joint Municipal Authority since 2009. Keller Engineers were a key component in every area from design to construction for the first phase of Shuster Way Heritage trail that was completed in 2015. Our partnership with Keller Engineers continued as we designed and completed the 2nd phase of the Shuster Way Heritage Trail in September of 2023. The staff are professional, passionate, and dedicated to a project from the beginning to completion. On behalf of Bedford Joint Municipal Authority, I would highly recommend Keller Engineers, Inc. Brian Sell, Chairman Bedford Joint Municipal Authority