Saint Mary Street

Responsibilities

  • Grant and Funding Applications
  • Rate and Tap Fee Analysis
  • Survey
  • Mapping Control
  • Easement Right-of-Way Plans
  • Permitting
  • Construction Stakeouts
  • Base Mapping
  • Courthouse Research
  • Utility Coordination
  • Landscape Architecture
  • Streetscape Design
  • Erosion/Sedimentation Control Plans
  • Wastewater Collection and Pumping Facilities
  • Water Storage, Distribution, and Transmission Design
  • Construction Inspection and Management

Owner

Loretto Borough, Cambria County

Project Details

This multi-phase revitalization project began with the replacement of Borough water and wastewater lines. Phase II, a streetscape project along Saint Mary Street, included design of a half mile of sidewalks, curbing, ADA compliant curb ramps, and driveways. Phase III was the planting of 40 street trees and Phase IV consisted of installing 41 lamp posts which match the original lamp posts on the Charles Schwab Estate.

The streetscape project was designed to maintain the rich historic aesthetic of the town which includes the beautiful Charles Schwab Estate (located at the end of Saint Mary Street) and Saint Francis University.

Photos

[Brian Moore] has kept me informed every step of the way on the front lines of this project. With this being my first project and me still being on a huge learning curve, that speaks volumes about Keller Engineers and Brian’s commitment to your customers. Chuck Case, Manager Falls Creek Borough, Jefferson County

Contact Us Today!

Send Us a Message