Patton Municipal Authority Water System Improvements

Responsibilities

  • Grant and Funding Applications
  • Survey
  • Mapping Control
  • Easement Right-of-Way Plans
  • Base Mapping
  • Courthouse Research
  • Utility Coordination
  • Wetlands Stakeout
  • Subdivision Plan
  • Design of Water Treatment and Pumping Facilities
  • Design of Storage, Distribution, and Transmission Design
  • Rate and Tap Fee Analysis
  • Well Development
  • Permitting
  • Bidding Services
  • Construction Inspection and Management

Owner

Patton Municipal Authority, Cambria County

Project Details

This six-contract project was undertaken to replace an existing surface water source with public supply wells, and to interconnect with the neighboring Elder Township Authority.

Design and construction services were provided for two-220 gallons per minute wells, a water treatment facility, a booster pumping station, a 125,000 gallon water storage tank, radio system controls, and 22,000 LF of water transmission main.

Photos

We have teamed with Keller Engineers on several design-build projects for PennDOT. When selecting a designer, the more critical factors are trust and competence, more so than a low price. If your designer makes a mistake in quantities it can cost you a lot of money. We have stayed with Keller Engineers because we trust them to provide competent service at a competitive price.  S. Scott Grannas, Vice President Grannas Bros. Stone & Asphalt Co., Inc.

Contact Us Today!

Send Us a Message