Pennsylvania State University, Blair County
Keller Engineers replaced two existing parking lots on the Greater Allegheny campus of the Pennsylvania State University. Topographic survey and site assessment of the pavement and drainage piping to be replaced was performed. Keller staff prepared the design drawings and specifications for the replacement lots, including new storm inlets and piping. The parking lot for the dormitory involved replacement of an existing set of stairs with a ramp for improved ADA accessibility into the dormitory and for ease of deliveries and “move-in/move-out” days.
During construction of the dormitory parking lot, the University requested design drawings and bid documents for the replacement of a parking lot/truck court for the campus maintenance building. Keller staff performed quick turnaround on the maintenance building drawings so the client could bid and construct the lot before paving season ended.
Keller Engineers has been the partnering Engineer firm for Bedford Joint Municipal Authority since 2009. Keller Engineers were a key component in every area from design to construction for the first phase of Shuster Way Heritage trail that was completed in 2015. Our partnership with Keller Engineers continued as we designed and completed the 2nd phase of the Shuster Way Heritage Trail in September of 2023. The staff are professional, passionate, and dedicated to a project from the beginning to completion. On behalf of Bedford Joint Municipal Authority, I would highly recommend Keller Engineers, Inc. Brian Sell, Chairman Bedford Joint Municipal Authority