Mount Union Lempkelde Source Development

Responsibilities

  • Grant and Funding Applications
  • Survey
  • Mapping Control
  • Easement Right-of-Way Plans
  • Base Mapping
  • Courthouse Research
  • Utility Coordination
  • Wetlands Stakeout
  • Water Treatment and Pumping Facilities
  • Storage, Distribution, and Transmission Design
  • Water Feasibility Studies and Analysis
  • Rate and Tap Fee Analysis
  • Well Development
  • Permitting
  • Bidding Services
  • Construction Inspection and Management

Owner

Mount Union Municipal Authority, Huntingdon County

Project Details

Keller Engineers was responsible for the design of two – 300 GPM wells, transmission mains, disinfection, booster pumping, and control facilities to provide the community with a new, economical water source.

Photos

Keller Engineers has been the partnering Engineer firm for Bedford Joint Municipal Authority since 2009. Keller Engineers were a key component in every area from design to construction for the first phase of Shuster Way Heritage trail that was completed in 2015. Our partnership with Keller Engineers continued as we designed and completed the 2nd phase of the Shuster Way Heritage Trail in September of 2023. The staff are professional, passionate, and dedicated to a project from the beginning to completion. On behalf of Bedford Joint Municipal Authority, I would highly recommend Keller Engineers, Inc. Brian Sell, Chairman Bedford Joint Municipal Authority

Contact Us Today!

Send Us a Message