SEDA-COG Joint Rail Authority, Lycoming County
Located on the Lycoming Valley Railroad between Montoursville and Williamsport, this structure replaced an 85-year-old bridge that was heavily damaged by Tropical Storm Lee in September 2011.
The new three-span, 476’ long steel bridge was designed to withstand frequent flooding on Loyalsock Creek by increasing the waterway opening by 50% and supporting the concrete foundation on steel piles driven to bedrock. The three-span configuration was selected to minimize the number of piers within the creek and to permit construction beneath overhead transmission lines at the site. Additional work performed included:
Keller Engineers has been an extremely valuable asset for us in the development/construction of our store sites by providing accurate and timely structural and site development drawings and answers to related questions. Their response and turn-around time to the Sheetz Store Development Department has been outstanding. We have no hesitation in turning to Keller Engineers for our store structural and site development needs. Joe S. Sheetz, Executive Vice President, Finance & Store Development Sheetz Corporation