JETSA – Fords Corner and New Municipal Building

Responsibilities

  • Survey
  • Grant and Funding Applications
  • Mapping Control
  • Easement Right-of-Way Plans
  • Base Mapping
  • Courthouse Research
  • Utility Coordination
  • Wetlands Stakeout
  • Subdivision Plan
  • Design of Wastewater Collection and Pumping Facilities
  • Design of ADA compliant sidewalks, curb ramps, and parking facilities
  • Act 537 Plans
  • Rate and Tap Fee Analysis
  • Land Planning Modules
  • Permitting
  • Bidding Services
  • Construction Inspection and Management

Owner

Jackson East Taylor Sewer Authority, Cambria County

Project Details

Wastewater Extension: This project involved construction of approximately 19,500 LF of 8” and 6” PVC wastewater main and 2,716 LF of 4” PVC force main, manholes, related appurtenances, and restoration.

The Pump Station project included the construction of two new pump stations, reconstruction of the existing Pump Station #12, and replacement of pumps at the existing Pump Stations #3 and #7, along with related appurtenances and restoration. The information will be entered into the Authority’s existing GIS system.

Municipal Building: This project included demolition of the existing office, utility relocation, a new 1,400 SF office building, design of an ADA concrete sidewalk and parking lot, new signage and two defined entrance/exit locations onto the state road.

Photos

I probably don’t say this enough, but we so appreciate the quality of work Keller Engineers does. The fact that they include building footprints and natural features makes these surveys super useful. I’m reminding my colleagues in other counties that their surveyors need to up their quality. F. Mark Schiavone, Executive Director Berkeley County Farmland Protection Board