PennDOT District 2-0, Centre County
Preliminary/Final Design and Construction Services provided for this project which included the reconstruction and widening for signalized intersection improvements to SR 0026 with SR 0045 and a bridge replacement. The new bridge was a 39’-0”’ span P/S concrete adjacent box beam superstructure on concrete abutments. The overall project included 2,932’ of approach roadway and intersection improvements. A temporary road was used to maintain traffic during construction allowing the new structure to be built on the existing alignment as well as phased construction to keep the intersection open to traffic during construction.
We have worked with Keller Engineers for structural and civil engineering support on six projects over the past five years and have been very pleased with the results. Our projects tend to be complicated phased renovation/ addition projects calling for creativity in planning and construction. I have been particularity pleased with their responsiveness to issues that arise during construction which is of particular importance to us and our clients. Vern L. McKissick, III, AIA, LEED AP, Owner/Architect McKissick Associates