PennDOT District 2-0, Centre County
Preliminary/Final Design and Construction Services provided for this project which included the reconstruction and widening for signalized intersection improvements to SR 0026 with SR 0045 and a bridge replacement. The new bridge was a 39’-0”’ span P/S concrete adjacent box beam superstructure on concrete abutments. The overall project included 2,932’ of approach roadway and intersection improvements. A temporary road was used to maintain traffic during construction allowing the new structure to be built on the existing alignment as well as phased construction to keep the intersection open to traffic during construction.
I probably don’t say this enough, but we so appreciate the quality of work Keller Engineers does. The fact that they include building footprints and natural features makes these surveys super useful. I’m reminding my colleagues in other counties that their surveyors need to up their quality. F. Mark Schiavone, Executive Director Berkeley County Farmland Protection Board