Falls Creek Borough – City of DuBois Water Interconnections

Responsibilities

  • Grant and Funding Applications
  • Survey
  • Mapping Control
  • Easement Right-of-Way Plans
  • Base Mapping
  • Courthouse Research
  • Utility Coordination
  • Wetlands Stakeout
  • Storage, Distribution, and Transmission Design
  • Rate and Tap Fee Analysis
  • Permitting
  • Bidding Services
  • Construction Inspection and Management

Owner

Falls Creek Borough Municipal Authority, Clearfield County

Project Details

This project included the design and construction of a waterline interconnection with the City of Dubois. This 25,000 LF stretch of waterline provides the Municipal Authority with water directly from the City of Dubois. This enabled them to eliminate their Water Treatment Facilities and their surface water source. In addition, the project included communications upgrades to their existing water system which monitors tank levels, control booster station operation, and regulates the inflow of purchased water.

Photos

We have worked with Keller Engineers for structural and civil engineering support on six projects over the past five years and have been very pleased with the results. Our projects tend to be complicated phased renovation/ addition projects calling for creativity in planning and construction.  I have been particularity pleased with their responsiveness to issues that arise during construction which is of particular importance to us and our clients. Vern L. McKissick, III, AIA, LEED AP, Owner/Architect McKissick Associates

Contact Us Today!

Send Us a Message