Allegheny Portage Railroad 6 to 10 Trail

Responsibilities

  • Boundary Survey
  • Topographic Survey
  • Construction Stakeout Survey
  • NPDES Stormwater Construction Permit
  • Erosion and Sedimentation Plan

Owner

National Park Service, Cambria County

Project Details

Keller Engineers provided the following survey services for a National Park Service project. Additionally, during the multiple stages of this project, the survey team resolved a property dispute that surfaced.

  • Boundary survey for a 100-acre tract of National Park Service property
  • Location and survey of the 10-mile Wilderness Trail corridor from Summit Level to Foot-of-Ten
  • Boundary survey for various parking areas, rest areas, along the old Portage Railroad bed, and interpretation areas.
  • Highway Occupancy topographic surveys for three crossings (safety factors)
  • Construction survey and handicapped accessibility survey in selected areas.

Photos

Keller Engineers has been the partnering Engineer firm for Bedford Joint Municipal Authority since 2009. Keller Engineers were a key component in every area from design to construction for the first phase of Shuster Way Heritage trail that was completed in 2015. Our partnership with Keller Engineers continued as we designed and completed the 2nd phase of the Shuster Way Heritage Trail in September of 2023. The staff are professional, passionate, and dedicated to a project from the beginning to completion. On behalf of Bedford Joint Municipal Authority, I would highly recommend Keller Engineers, Inc. Brian Sell, Chairman Bedford Joint Municipal Authority

Contact Us Today!

Send Us a Message