PennDOT District 2-0, Centre County
Preliminary/Final Design and Construction Services provided for this project which included the reconstruction and widening for signalized intersection improvements to SR 0026 with SR 0045 and a bridge replacement. The new bridge was a 39’-0”’ span P/S concrete adjacent box beam superstructure on concrete abutments. The overall project included 2,932’ of approach roadway and intersection improvements. A temporary road was used to maintain traffic during construction allowing the new structure to be built on the existing alignment as well as phased construction to keep the intersection open to traffic during construction.
Keller Engineers has been an extremely valuable asset for us in the development/construction of our store sites by providing accurate and timely structural and site development drawings and answers to related questions. Their response and turn-around time to the Sheetz Store Development Department has been outstanding. We have no hesitation in turning to Keller Engineers for our store structural and site development needs. Joe S. Sheetz, Executive Vice President, Finance & Store Development Sheetz Corporation