Wingate by Wyndham Downtown Altoona

Responsibilities

  • Survey
  • Sketch plans
  • Site Planning, Design, and Layout
  • Parking Lot Plan
  • Landscape Plan
  • Utility Coordination - Additional coordination for discharge permit with Altoona Water Authority due to stormwater discharge to combined sewer system
  • Architectural coordination
  • Sewage Facilities Planning
  • Erosion/Sedimentation Control Plans
  • Stormwater Management, Analysis, Design, and Permitting
  • Coordination to obtain easement and place transformer for hotel in public right-of-way due to site constraints
  • Construction coordination

Owner

GAJE Downtown Development, LP / R. James Marcelli, Blair County

Project Details

This project included the redevelopment of a downtown property to construct a 4-story, 83 room hotel and associated parking with access from Chestnut Avenue and Green Avenue alley, with Green Avenue alley being widened to 20’. Additional parking is provided on the south side of the ally.

Project Uniqueness/Challenges: Two of the bordering streets are one-way, therefore providing guest vehicular access to the front of the building for check-in/check-out was a challenge. Keller staff worked with the project’s Architect to come up with an L-shaped hotel layout that met the hotel interior needs as well as provided the site needs to allow space for on-site vehicle circulation to the front of the hotel.

Photos

We have worked with Keller Engineers for structural and civil engineering support on six projects over the past five years and have been very pleased with the results. Our projects tend to be complicated phased renovation/ addition projects calling for creativity in planning and construction.  I have been particularity pleased with their responsiveness to issues that arise during construction which is of particular importance to us and our clients. Vern L. McKissick, III, AIA, LEED AP, Owner/Architect McKissick Associates

Contact Us Today!

Send Us a Message