REI, Bedford County
This project included the design and construction of a 525,000 SF distribution center located on a 60-acre site. The project also included outdoor recreation amenities such as a one-mile circuit mountain bike trail, a series of walking trails, and wildflower meadows.
This new distribution center received “Silver” LEED Certification from the U.S. Green Building Council. The site/civil and landscape architecture design comprises nearly half of the certification credits.
Penn Cambria School District has collaborated the last 4 years with the Keller Engineer’s team to complete a multi-phased paving and drainage project on our HS campus. I have personally worked with Adam Long, Brian Smith and Shawn Ritchey throughout the entire project and they made Penn Cambria feel like we were their only client. The personal attention to our needs and specific details of this project were second to none. The communication aspect of the Keller Engineer Team was outstanding. We trust their process, their design and their commitment to a quality project that when completed, we are all very proud of. Bill Marshall, Superintendent Penn Cambria School District