State Route 30 Bypass

Responsibilities

  • Survey
  • Base Mapping
  • Utility Coordination
  • Permitting
  • Preliminary and Final Design - Road Rehabilitation
  • Preliminary and Final Design - Intersection and Interchange
  • Preliminary and Final Design - Safety Improvements
  • Traffic Control
  • Erosion Control/NPDES Permitting

Owner

PennDOT District 9-0, Bedford County

Project Details

This project included the concrete pavement restoration and overlay of SR 30, Sec 027, Bedford Bypass. The work included: concrete patching, bituminous overlay, shoulder upgrades, guiderail improvements, inlet adjustments, concrete barrier modifications, signing, pavement markings, delineation, and signal upgrades on a 3.5 mile section of the Bypass.

The project design was completed using an accelerated schedule at the request of our client. All plans were complete and approved ahead of time to allow the contractor to begin construction in advanced of PennDOT’s anticipated schedule.

Photos

Penn Cambria School District has collaborated the last 4 years with the Keller Engineer’s team to complete a multi-phased paving and drainage project on our HS campus. I have personally worked with Adam Long, Brian Smith and Shawn Ritchey throughout the entire project and they made Penn Cambria feel like we were their only client. The personal attention to our needs and specific details of this project were second to none. The communication aspect of the Keller Engineer Team was outstanding. We trust their process, their design and their commitment to a quality project that when completed, we are all very proud of. Bill Marshall, Superintendent Penn Cambria School District

Contact Us Today!

Send Us a Message