This project involved rehabilitating 1.37 miles of existing Puddintown Road and 1.30 miles of Houserville Road.
The scope of work on Puddintown Road included replacing drainage facilities, guiderail replacement and adjustments, total reconstruction of the Lenor Drive intersection to correct sight distance, waterline relocation, Cold In-Place Asphalt Pavement rehabilitation, and asphalt overlay.
The scope of work on Houserville Road included replacing drainage facilities, guiderail replacement and adjustments, replacement of 42”x72” CMP near intersection with SR 26, waterline relocation, and asphalt overlay. Also included was the reconfiguration of the SR 26 southbound to westbound Houserville Road movement to remove the high-speed fly lane to facilitate a future shared use path in this quadrant of the intersection.
Utility involvement on this project included:
Keller Engineers has been the partnering Engineer firm for Bedford Joint Municipal Authority since 2009. Keller Engineers were a key component in every area from design to construction for the first phase of Shuster Way Heritage trail that was completed in 2015. Our partnership with Keller Engineers continued as we designed and completed the 2nd phase of the Shuster Way Heritage Trail in September of 2023. The staff are professional, passionate, and dedicated to a project from the beginning to completion. On behalf of Bedford Joint Municipal Authority, I would highly recommend Keller Engineers, Inc. Brian Sell, Chairman Bedford Joint Municipal Authority