Summit Township Wastewater

Responsibilities

  • Survey
  • Mapping Control
  • Easement Right-of-Way Plans
  • Base Mapping
  • Courthouse Research
  • Utility Coordination
  • Wetlands Stakeout
  • Subdivision Plan
  • Design of Wastewater Collection and Pumping Facilities
  • As-built drawings
  • Permitting
  • Bidding Services
  • Construction Inspection and Management

Owner

Redevelopment Authority of Somerset County, Somerset County

Project Details

This project consisted of the design and installation of a wastewater collection system and pump station. The project was funded and supported by the Redevelopment Authority of Somerset County and was turned over to the Meyersdale Municipal Authority.

This section of the Township did not have a public wastewater system and was designated as an area of need. The new collection system included nearly 3,600 feet of 8” wastewater main, 900’ of force main, 22 lateral taps, railroad and stream bores and a pump station. The pump station delivers sewage across the Castleman River directly to one of the Meyersdale Municipal Authority’s pump stations.

Keller Engineers was responsible for survey, permitting, design, construction drawings and specifications, bidding, easement coordination, construction management (including monthly on-site job conferences) final inspection, and as-built drawings. Daily inspections were performed by the Somerset County Redevelopment Authority.

Project Uniqueness/Challenges: Coordination between the County Redevelopment Authority (funding agency) and the Meyersdale Municipal Authority (who is managing the completed system) was necessary.

The Meyersdale Municipal Authority requested we install a gravity system rather than a low-pressure system, which would result in all customers having an individual grinder pump. The Redevelopment Authority accommodated the request and secured funding for the addition to the project.

Photos

Penn Cambria School District has collaborated the last 4 years with the Keller Engineer’s team to complete a multi-phased paving and drainage project on our HS campus. I have personally worked with Adam Long, Brian Smith and Shawn Ritchey throughout the entire project and they made Penn Cambria feel like we were their only client. The personal attention to our needs and specific details of this project were second to none. The communication aspect of the Keller Engineer Team was outstanding. We trust their process, their design and their commitment to a quality project that when completed, we are all very proud of. Bill Marshall, Superintendent Penn Cambria School District

Contact Us Today!

Send Us a Message