Stryker Brigade Fire Protection Storage Tank

Responsibilities

  • Survey
  • Mapping Control
  • Easement Right-of-Way Plans
  • Base Mapping
  • Courthouse Research
  • Utility Coordination
  • Design of Water Treatment and Pumping Facilities
  • Design of Storage, Distribution, and Transmission
  • Bidding Services
  • Construction Administration
  • Permitting

Owner

Pennsylvania Department of General Services, Huntingdon County

Project Details

This project included the design and construction of a 71,000 gallon water storage tank and fire pump emergency generator control system to provide fire protection to the Department of General Services’ Huntingdon Readiness Center complex.

Project Uniqueness/Challenges:  Due to the potential for standing water to freeze during the winter months, spray foam insulation was applied to the exterior of the tank following construction.

Photos

Penn Cambria School District has collaborated the last 4 years with the Keller Engineer’s team to complete a multi-phased paving and drainage project on our HS campus. I have personally worked with Adam Long, Brian Smith and Shawn Ritchey throughout the entire project and they made Penn Cambria feel like we were their only client. The personal attention to our needs and specific details of this project were second to none. The communication aspect of the Keller Engineer Team was outstanding. We trust their process, their design and their commitment to a quality project that when completed, we are all very proud of. Bill Marshall, Superintendent Penn Cambria School District

Contact Us Today!

Send Us a Message