Mount Union Lempkelde Source Development

Responsibilities

  • Grant and Funding Applications
  • Survey
  • Mapping Control
  • Easement Right-of-Way Plans
  • Base Mapping
  • Courthouse Research
  • Utility Coordination
  • Wetlands Stakeout
  • Water Treatment and Pumping Facilities
  • Storage, Distribution, and Transmission Design
  • Water Feasibility Studies and Analysis
  • Rate and Tap Fee Analysis
  • Well Development
  • Permitting
  • Bidding Services
  • Construction Inspection and Management

Owner

Mount Union Municipal Authority, Huntingdon County

Project Details

Keller Engineers was responsible for the design of two – 300 GPM wells, transmission mains, disinfection, booster pumping, and control facilities to provide the community with a new, economical water source.

Photos

I probably don’t say this enough, but we so appreciate the quality of work Keller Engineers does. The fact that they include building footprints and natural features makes these surveys super useful. I’m reminding my colleagues in other counties that their surveyors need to up their quality. F. Mark Schiavone, Executive Director Berkeley County Farmland Protection Board

Contact Us Today!

Send Us a Message