Glendale Valley Municipal Authority

Responsibilities

  • Survey
  • Mapping Control
  • Easement Right-of-Way Plans
  • Construction Stakeouts
  • Base Mapping
  • Courthouse Research
  • Utility Coordination
  • Wetlands Stakeout
  • Subdivision Plan
  • Design of Water Treatment and Pumping Facilities
  • Design of Storage, Distribution, and Transmission
  • Water Feasibility Studies and Analysis
  • Rate and Tap Fee Analysis
  • Permitting
  • Construction Inspection and Management
  • Grant and Funding Applications
  • Wastewater Treatment Facilities
  • Wastewater Collection and Pumping Facilities
  • Act 537 Plans
  • Chapter 94 Reports
  • Annual Reports and Budgets
  • Rate and Tap Fee Analysis
  • Land Planning Modules
  • Bidding Services
  • Construction Inspection and Management

Owner

Glendale Valley Municipal Authority, Cambria County

Project Details

Keller Engineers water/wastewater team designed a 500,000 GPD extended aeration wastewater treatment facility, pumping facilities, 160,000 LF wastewater mains, and associated appurtenances to serve 860 existing customers and the Glendale Yearound Development. The project also included waterline extensions to the Beaver Valley and Flinton areas of White Township.

A Supervisory Control and Data Acquisition (SCADA) Control System was originally installed with the pump stations. In 2020 the system was upgraded to operate and monitor various controls at the wastewater treatment facility, including activation by use of dissolved oxygen probes.

Photos

[The] entire staff did a wonderful job! We truly appreciate all the hard work in making our bridge project a success and something we can be very proud to have in our township. Bev Sherwood Burns, Supervisor Blacklick Township