Glendale Valley Municipal Authority, Cambria County
Keller Engineers water/wastewater team designed a 500,000 GPD extended aeration wastewater treatment facility, pumping facilities, 160,000 LF wastewater mains, and associated appurtenances to serve 860 existing customers and the Glendale Yearound Development. The project also included waterline extensions to the Beaver Valley and Flinton areas of White Township.
A Supervisory Control and Data Acquisition (SCADA) Control System was originally installed with the pump stations. In 2020 the system was upgraded to operate and monitor various controls at the wastewater treatment facility, including activation by use of dissolved oxygen probes.
Penn Cambria School District has collaborated the last 4 years with the Keller Engineer’s team to complete a multi-phased paving and drainage project on our HS campus. I have personally worked with Adam Long, Brian Smith and Shawn Ritchey throughout the entire project and they made Penn Cambria feel like we were their only client. The personal attention to our needs and specific details of this project were second to none. The communication aspect of the Keller Engineer Team was outstanding. We trust their process, their design and their commitment to a quality project that when completed, we are all very proud of. Bill Marshall, Superintendent Penn Cambria School District