Loretto Borough, Cambria County
This multi-phase revitalization project began with the replacement of Borough water and wastewater lines. Phase II, a streetscape project along Saint Mary Street, included design of a half mile of sidewalks, curbing, ADA compliant curb ramps, and driveways. Phase III was the planting of 40 street trees and Phase IV consisted of installing 41 lamp posts which match the original lamp posts on the Charles Schwab Estate.
The streetscape project was designed to maintain the rich historic aesthetic of the town which includes the beautiful Charles Schwab Estate (located at the end of Saint Mary Street) and Saint Francis University.
Penn Cambria School District has collaborated the last 4 years with the Keller Engineer’s team to complete a multi-phased paving and drainage project on our HS campus. I have personally worked with Adam Long, Brian Smith and Shawn Ritchey throughout the entire project and they made Penn Cambria feel like we were their only client. The personal attention to our needs and specific details of this project were second to none. The communication aspect of the Keller Engineer Team was outstanding. We trust their process, their design and their commitment to a quality project that when completed, we are all very proud of. Bill Marshall, Superintendent Penn Cambria School District