Harris Township, Centre County
This project included the design and construction of an 8’ wide mixed-use pathway along South Atherton Street.
The project included stormwater pipe replacement, new inlets, pathway vertical alignment adjustment, correction of existing drainage problems, and the replacement of 1,570 LF of 24” storm water pipe, and 1,480 LF of bituminous pathway. Erosion and Sediment Control Plan permits and approvals were obtained and coordination with PennDOT was provided.
All work was completed to Federal Highway Administration (FHWA) and PennDOT design standards, specifications, and inspection criteria. This project utilized Transportation Enhancement funds.
I probably don’t say this enough, but we so appreciate the quality of work Keller Engineers does. The fact that they include building footprints and natural features makes these surveys super useful. I’m reminding my colleagues in other counties that their surveyors need to up their quality. F. Mark Schiavone, Executive Director Berkeley County Farmland Protection Board