Huntingdon County
The project consisted of a superstructure replacement and widening of the bridge having three 57’-0” spans. The existing steel superstructure was removed and replaced with new steel I-beams and a concrete deck. The deck and all substructure units were widened to accommodate two traffic lanes. Total project length was 630’-0” including approach roadway and drainage facilities.
The bridge is located directly adjacent a church. Care was taken to minimize impact to the church and associated parking facilities. Additionally, the project included several environmental concerns. Stream disturbance was minimized to avoid impact to a species of concern.
Keller Engineers has been an extremely valuable asset for us in the development/construction of our store sites by providing accurate and timely structural and site development drawings and answers to related questions. Their response and turn-around time to the Sheetz Store Development Department has been outstanding. We have no hesitation in turning to Keller Engineers for our store structural and site development needs. Joe S. Sheetz, Executive Vice President, Finance & Store Development Sheetz Corporation