University Park Airport – Crosswinds Parking Lot

Responsibilities

  • Due Diligence/Site Feasibility Studies
  • Survey
  • Base Mapping
  • Courthouse Research
  • Site Planning, Design, and Layout
  • Parking Lot Design
  • Permitting
  • Easement Right-of-Way Plans
  • Landscape Plan
  • Grading
  • Utility Coordination
  • Design of Foundations and Retaining Walls
  • Municipal Reviews
  • Sewage Facilities Planning
  • Wastewater Collection and Pumping Facilities
  • Erosion/Sedimentation Control Plans
  • NPDES Permitting
  • Stormwater Management, Analysis, Design, and Permitting
  • Signage
  • Pavement Markings

Owner

Centre County Airport Authority, Centre County

Project Details

This project, located on a 20-acre site, included the expansion of public parking facilities with 503 parking stalls, ADA compliant pedestrian walkways and curb ramps, a bus shelter, and exit kiosk.

Project Challenges/Uniqueness:

  • The design of facilities in this project had to be in conformance with FAA regulations and requirements relative to air navigation safety.

Photos

We have worked with Keller Engineers for structural and civil engineering support on six projects over the past five years and have been very pleased with the results. Our projects tend to be complicated phased renovation/ addition projects calling for creativity in planning and construction.  I have been particularity pleased with their responsiveness to issues that arise during construction which is of particular importance to us and our clients. Vern L. McKissick, III, AIA, LEED AP, Owner/Architect McKissick Associates

Contact Us Today!

Send Us a Message