Urology Specialist of West Florida. Pinellas County, Florida
This project, a renovation to an existing 3,500 SF concrete block building, was subject to extreme wind conditions.
Keller Engineers structural team modified the existing structure to withstand the wind loads, and reinforced the foundations to support the heavy loads from radiation shielding and oncology treatment equipment. The cantilevered awnings were especially challenging due to the extreme weather conditions.
Keller Engineers has been the partnering Engineer firm for Bedford Joint Municipal Authority since 2009. Keller Engineers were a key component in every area from design to construction for the first phase of Shuster Way Heritage trail that was completed in 2015. Our partnership with Keller Engineers continued as we designed and completed the 2nd phase of the Shuster Way Heritage Trail in September of 2023. The staff are professional, passionate, and dedicated to a project from the beginning to completion. On behalf of Bedford Joint Municipal Authority, I would highly recommend Keller Engineers, Inc. Brian Sell, Chairman Bedford Joint Municipal Authority