Fulton County Medical Center, Fulton County
This project included the construction of a 17,600 SF Patient Services and Administration building that consolidated six hospital ancillary sites into one building on the medical campus. Site work on this included design and construction of a new 80-stall parking lot, two bio-retention basins, erosion and sedimentation control measures, landscaping, and ADA compliance walkways.
Project Uniqueness/Challenges:
Keller Engineers’ Structural Division was responsible for the design of all structural elements. The building has a steel frame with conventional concrete foundations.
We have teamed with Keller Engineers on several design-build projects for PennDOT. When selecting a designer, the more critical factors are trust and competence, more so than a low price. If your designer makes a mistake in quantities it can cost you a lot of money. We have stayed with Keller Engineers because we trust them to provide competent service at a competitive price. S. Scott Grannas, Vice President Grannas Bros. Stone & Asphalt Co., Inc.