Foxhead Industrial Park

Responsibilities

  • Survey
  • Site Planning, Design, and Layout
  • Site Grading
  • Roadway Extension
  • Sewer and Water Main Extensions
  • Stormwater Management
  • Subdivision Plans

Owner

Fox Township Supervisors, Elk County

Project Details

The project included the survey and design to extend the existing roadway, 2,224’ of 6″ PVC water main, and 1,663’ of 8″ PVC sewer main within the 32-acre industrial park.  Drainage improvements were addressed with the design and construction of a sedimentation basin/detention facility with conveyance ditches and piping.

Two acid mine discharges existed on the site at the beginning of the design.  A passive treatment facility was designed to treat the water from its source.  This passive facility also served as a mitigation technique to remove jurisdictional wetlands from within the buildable area of the lots.

Photos

[Brian Moore] has kept me informed every step of the way on the front lines of this project. With this being my first project and me still being on a huge learning curve, that speaks volumes about Keller Engineers and Brian’s commitment to your customers. Chuck Case, Manager Falls Creek Borough, Jefferson County

Contact Us Today!

Send Us a Message