John Imbt, Centre County
This project included the design of a business park with access to Science Park Road. Layout consisted of 2,200’ of roadway. All utilities were extended into the site to serve tenants. Drainage improvements consisted of inlets and piped conveyance to a ‘regional’ stormwater management facility in the park.
The first lot to be developed in the park was to accommodate Minitab, Inc. This project consisted of lot layout/site design for a four-story corporate headquarters facility with associate parking, stormwater, and utility connections. Mini Tab was also interested in the aesthetics of the site; therefore, a Labyrinth was designed and constructed on the grounds as a passive recreational feature for employees.
SRI International was the second organization to build within the Imbt Business Park. This project consisted of a 9,800 SF office building with associated parking, stormwater, and all utility connections.
Penn Cambria School District has collaborated the last 4 years with the Keller Engineer’s team to complete a multi-phased paving and drainage project on our HS campus. I have personally worked with Adam Long, Brian Smith and Shawn Ritchey throughout the entire project and they made Penn Cambria feel like we were their only client. The personal attention to our needs and specific details of this project were second to none. The communication aspect of the Keller Engineer Team was outstanding. We trust their process, their design and their commitment to a quality project that when completed, we are all very proud of. Bill Marshall, Superintendent Penn Cambria School District