Altoona Blair County Development Corporation, Blair County
Keller Engineers’ team provided all necessary survey and civil engineering services to design and construct a new 114-acre industrial park. Specific amenities in the park include design and construction of 2,300’ of new Township roadway and infrastructure such as utility extensions, drainage, water, and sewer. Drainage improvements included constructed wetlands and bio-retention facilities to control stormwater runoff rate and volume, and to improve water quality.
Project Uniqueness/Challenges: The most challenging aspect of this project was obtaining the NPDES permit. FEMA revised the floodplain maps after design was under way, which resulted in the wetlands being reclassified as Exceptional Value (EV). This change made permitting wetland impacts far more difficult. Once permits were obtained, a major modification was made to the NPDES permit to better utilize the available grant money.
Keller Engineers has been the partnering Engineer firm for Bedford Joint Municipal Authority since 2009. Keller Engineers were a key component in every area from design to construction for the first phase of Shuster Way Heritage trail that was completed in 2015. Our partnership with Keller Engineers continued as we designed and completed the 2nd phase of the Shuster Way Heritage Trail in September of 2023. The staff are professional, passionate, and dedicated to a project from the beginning to completion. On behalf of Bedford Joint Municipal Authority, I would highly recommend Keller Engineers, Inc. Brian Sell, Chairman Bedford Joint Municipal Authority